Doha, Qatar +974 7070 8830 khaled@firecloud360.com
24/7 emergency response, 365 days a year
Fire Cloud TRADING, CONTRACTING
& SERVICES
Request a Quote
SPECIALIST TESTING & INSPECTION

Fire Pump Performance Test

Churn and annual flow testing to NFPA 25. We run your electric or diesel fire pump through its full range, plot its curve against the factory rating and document the results for your records.

AT A GLANCE
Standard
NFPA 25
Pumps
Electric & diesel
Routine
Churn (no-flow) test
Annual
Flow test at 0%, 100% & 150% of rated flow
Deliverable
Test sheet & performance curve
WHAT IS A FIRE PUMP?

The heart of your sprinkler and hydrant system

A fire pump is part of the water supply for sprinkler, standpipe and hydrant systems, driven by an electric motor or a diesel engine. It draws water from the public mains or a static tank and raises the flow and pressure delivered to the sprinkler risers and hose standpipes.

Because the whole system depends on it, NFPA 25 requires fire pumps to be tested regularly — a routine churn (no-flow) test and an annual flow test — to prove they will perform as designed.

Fire pump room with diesel and electric fire pump sets
What you receive
  • Churn and annual flow testing of electric and diesel fire pumps
  • Readings at 0%, 100% and 150% of rated flow
  • Actual pump curve plotted against the factory curve and previous results
  • Test sheet for your inspection and Civil Defence records
  • Recommendations and repairs if performance has dropped
Routine churn test

The pump is run without water flowing, as required by NFPA 25 — weekly or monthly depending on the driver type. Our technicians:

  • Run the pump for a minimum of 10 minutes
  • Record suction and discharge pressure gauge readings
  • Check the packing glands for slight discharge and adjust the gland nuts if necessary
  • Check for unusual noise or vibration
  • Check packing boxes, bearings and pump casing for overheating
  • Record the pump starting pressure and interpret the results
Annual flow test

Once a year the pump’s flow and pressure are measured across its full range. With the discharge line closed and the test line open, we record pressure and RPM at 0%, 100% and 150% of the rated flow — for both electric and diesel pumps.

The readings are plotted on a hydraulic graph and compared with the factory specification and previous years’ results. A significant drop in performance is investigated and the necessary repairs are carried out.

MORE SPECIALIST TESTS

Other tests we carry out in-house

FM-200 Room Integrity Test
Door-fan testing that proves your enclosure holds the clean agent for the full retention time.
View test →
Foam Conductivity Test
Confirms your AFFF proportioning delivers the correct 3% or 6% concentration.
View test →
Clean Agent Cylinder Refilling
FM-200 and Novec 1230 cylinder repair, refill and 24-hour emergency recharge.
View test →
Need this test carried out?
Our engineers can schedule a visit anywhere in Qatar — 24/7 for urgent cases.
Call +974 7070 8830WhatsApp
BOOK A TEST

Book your test with our engineers

Tell us about the system and location. We will confirm the scope, schedule and price.

Office
Building 194, Street 105, Zone 57, Doha, Qatar
Availability
24/7 emergency response, 365 days a year
Chat on WhatsApp